Trial Run On Anand Vihar’s Regional Rapid Transit System In November
Curated By: Business DeskLast Updated: September 02, 2024, 15:29 ISTThe elevated bridge between Anand Vihar to Sahibabad RRTS has been...
Curated By: Business DeskLast Updated: September 02, 2024, 15:29 ISTThe elevated bridge between Anand Vihar to Sahibabad RRTS has been...
The station, to be the first in Meerut, will be opened for passenger operation from 2pm on Sunday. Representational imageThe...
The National Capital Region Transport Corporation is overseeing the rapid rail network’s construction. (File pic/PTI)The systems, the corporation said, are...
Presently, a 34 km section between Sahibabad and Modi Nagar North of the Delhi-Ghaziabad-Meerut RRTS corridor is operational. (File pic/PTI)The...
At present, RRTS trains, also called the Namo Bharat trains, are running in the 34 km section between Sahibabad and...
Presently, a 34 km section between Sahibabad and Modi Nagar North of the Delhi-Ghaziabad-Meerut RRTS corridor is operational. (File pic/PTI)Three...